Construction Steps Of Concrete Floor
1. First of all, the construction retest should be carried out. The staff need to conduct a secondary inspection of the construction environment and reinforce the control pile.
2. Raw materials need to be prepared.
Cement, stones and sand are essential. It is recommended to purchase them
directly from the local building materials market and then transport them back
by truck, which can save a lot of trouble.
3. It is necessary to adjust the concrete
mix proportion, which should be carried out in strict accordance with the
requirements. The proportion of each material should be carefully considered.
After obtaining the approval of the chief engineer, trial mixing should be
carried out.
4. Sampling inspection is required, and two
groups of test pieces are made respectively for testing to ensure that there is
no problem with the compressive capacity of concrete.
5. For concrete pouring, the first thing to
do is to prepare the base course. First, clean up the dust and impurities on
the ground, and then take drainage measures. Every step is very important.
Secondly, the construction personnel should prepare the construction machine.
Before pouring concrete, they must apply a layer of isolating agent to the
formwork to be used, so as to prevent the concrete from sticking to the
formwork and it is not easy to demould in the later stage. Finally, it is
necessary to pave the concrete evenly, and also use professional tools to
flatten the ground, so as not to appear uneven phenomenon.